Manufacturing · free · about 4 minutes

Get the Quote Out in 48 Hours: The 8-Check Quoting Scorecard for Job Shops Nationwide

The RFQ landed Monday. Your quote went out the following Tuesday. The buyer awarded the run on Friday, to the shop that quoted Wednesday. That is a job and its reorders gone in a week. It happens to shops where quoting waits on one estimator.

The Manufacturing RFQ Quoting Turnaround Scorecard is a free, self-scoring checklist of eight checks for manufacturers and machine shops nationwide, run remotely across the United States by Rodgers Intelligence Group, based in Denver, Colorado. Mike Rodgers wrote the checks and answers every question himself. Each check is a written rule: it says what in place looks like and gives a stated fix when the check fails.

Who it is for: manufacturers and machine shops nationwide What you get: a score, a verdict and a fix list Cost: free, no email

Your answers never leave this page. The scorecard runs in your browser. Nothing is stored, nothing is sent, and there is no email field. Demonstration, not a client result.

The 8-check scorecard

Answer each check. Your result updates as you go. If a check is missing or partial, its fix appears underneath. The result is a finished document you keep: a score, a verdict and a fix list, and the eight checks on this page are the written rulebook behind it.

  1. Check 1

    Every RFQ lands in one quoting queue

    In place Email, portal and rep-forwarded RFQs arrive in one inbox that someone owns each morning.

  2. Check 2

    Every RFQ is acknowledged within four business hours

    In place The buyer hears 'received, quoting by Thursday' fast, even when the quote takes days.

  3. Check 3

    Print revision level is captured and checked

    In place The quote is built on the revision the buyer actually sent, and the rev is written on the quote.

  4. Check 4

    Capability and DFM screening happens before estimating

    In place Jobs you cannot run profitably get declined early, with a referral, instead of quoted into a loss.

  5. Check 5

    Material and outside-process pricing is current

    In place Cost basis is date-stamped and refreshed on a schedule, so quotes are not built on last quarter's steel.

  6. Check 6

    Margin and lead-time risk get reviewed before send

    In place Someone checks margin, capacity and lead-time risk before the quote leaves, not after the PO arrives.

  7. Check 7

    Quotes go out inside a stated turnaround

    In place You publish your turnaround and meet it, or you tell the buyer early and hold the relationship.

  8. Check 8

    Follow-up runs on a fixed cadence and the quote log is updated

    In place Day-3 and day-7 touches happen, and win/loss is recorded per quote.

Your result
0 / 8
Answer the eight checks to see your verdict.
0 of 8 answered
Email my result to a human

What your score means

  • 8 of 8: Your quoting is an advantage. The next gain is pricing discipline: review margin by job family before chasing more RFQs.
  • 6-7 of 8: You are losing awards to timing and risk. Fix the two failing checks; most are queue and checklist edits.
  • 5 or fewer: RFQs are dying in transit. Fix checks 1, 2 and 7 first: one queue, fast acknowledgement, a stated turnaround you keep.

What the current process costs

Nobody sends a bill for the current process, which is why it survives. The work lands on the estimator wearing three hats, and the eight fixes above carry their own minutes. Add the minutes for the checks that failed on your scorecard and multiply by what an hour of that time costs you. The answer is your own number for one RFQ cycle, and you are the only person who can compute it.

Hold that number against the routes on this page. Fixing the checks yourself costs the minutes printed on each fix. The RIG One-Workflow Review is a $3,500 fixed fee, with a written readout within ten business days after required access, and the readout is yours to use with any vendor or internally. Fewer than three failing checks says the fix list is the right route; three or more says the workflow is worth a written look.

Frequently asked questions

What is the Manufacturing RFQ Quoting Turnaround Scorecard?

It is a free, self-scoring checklist of eight checks for manufacturers and machine shops nationwide. Each check states what in place looks like and gives a plain-language fix with a minutes estimate when it fails. You finish with a score, a verdict and a fix list.

How long does it take?

About four minutes. You answer each check as in place, partial or missing, and the score and verdict update as you go.

Where do my answers go?

Nowhere. The scorecard runs in your browser: nothing is stored or sent and there is no email field. Your result appears on the page and stays with you.

What happens after the score, and what does the next step cost?

Fixing the checks yourself costs nothing beyond the minutes each fix carries, and the free 12-check Client Intake Test Kit needs no email. If three or more checks fail, the RIG One-Workflow Review is a $3,500 fixed fee with a written readout within ten business days after required access; it is not a retainer, and details are at rodgersintelligence.com/workflow-review.

More questions, answered directly

What does my score mean?

The score counts the checks that are in place. The verdict under it says whether the workflow or the effort is the problem, and the fix list names the failing checks in the order to take them.

Do I have to buy anything to use this scorecard?

No. The scorecard is free and the answers stay in your browser, and the free 12-check Client Intake Test Kit needs no email. The One-Workflow Review is a $3,500 fixed fee, with a written readout within ten business days after required access, for the case where the workflow is the problem rather than the effort.

We have an ERP. Does quoting still need a scorecard?

The checks cover the days around the quote, from how the RFQ lands to when go or no-go is decided. The ERP records the quote; the scorecard checks the turnaround your buyer feels.

Who is behind this scorecard?

Rodgers Intelligence Group, based in Denver, Colorado. Mike Rodgers wrote the eight checks and answers every copied summary sent through rodgersintelligence.com/contact himself. The checks are written rules; nothing on this page is a client outcome.

The next step

See the manufacturing workflow page · Send Mike a brief