Skip to content
RIG. Get in touch
Construction AI system showing bid margin protection and change-order capture
← Hire RIG · the verticals

Construction · the margin play · $10M–$100M GC & specialty

Protect the margin. Win the bid.

You don't lose jobs to the competition — you lose them to a 2% estimating error and a schedule nobody caught slipping until it was three weeks gone. Every thin bid, every change order that never gets signed, every float that vanishes before anyone flags it is profit walking off the site. RIG puts governed AI where it protects margin — and only where your crews will actually use it on Monday morning.

Put me on your problem →

02 · how you make money

Three places the money actually moves.

The bid stops eating the margin

An AI check on every estimate before it goes out — historical-cost deviation, scope gaps, margin floor. A small miss on a fixed-price job no longer swallows the whole profit.

Change orders stop leaking

Scope creep gets caught and routed to a signed CO instead of disappearing. Work that used to get done and never billed turns back into revenue.

The schedule runs ahead of the slip

Float-burn and schedule-risk signals reach the PM by text — not a dashboard nobody opens. You catch the slip before liquidated damages and overtime catch you.

It compounds

We don't hand you a pilot and leave. The system gets built out job over job — more of your estimating and field ops governed, each PM running more jobs with the same crew, a moat your competitors can't copy fast.

03 · the play

Same sequence, every time.

No science project. The exact audit → ship → install sequence that protects bid margin across a mid-market contractor's last 20 jobs.

— 01

Audit

We map the margin leaks across your last 20 jobs — where AI protects profit and where it's just noise. A scored opportunity list, signed off — not a slide deck.

— 02

Ship one engine

One governed engine — bid guard on every estimate, or schedule-slip signals to the PM — live in production in 90 days, measured against a real job, not a demo.

— 03

Install the discipline

Governance, the operating model, and the field training stay behind — so the gains hold, the crews keep using it, and the next engine ships faster.

04 · the receipt

— flagship · a mid-market contractor · anonymized

One estimating line, rebuilt as a guardrail.

+2–4ptbid margin protected
90%+change orders captured
90 daysto live, governed

05 · the next move

Let's find your margin leak.

Tell me what you build and where the margin's leaking — thin bids, change orders, schedule slips. It goes straight to my inbox and I answer it — no funnel, no scheduling links.

Get in touch → ← back to the verticals